Open now Overland Park, KS · Johnson County & the KC metro Owner-run · Free on-site design & quote
Paver patio behind a brick home
Fall install schedule · through November

Paver patiosbuilt for Kansas clay

Patios, walkways, fire pit areas and steps across Johnson County. Owner-run — the person who quotes your yard is the one building it. Free on-site design and a fixed written price.

6 in.Compacted base
FreeOn-site design & quote
5–8Days on site
NovStill installing
What we do

Our services

Flatwork and low structures, in paver and natural stone. No mowing, no weekly service — this is all we do now.

Paver patio with seating
Free on-site quote

Paver patios

New patios, and replacements for concrete that has cracked or a paver field that started to sink. We paint the shape on the ground first so you can walk it and change your mind before anything gets dug.

250–800Typical sq ft
5–8 daysOn site
Paver walkway curving through a lawn
Free on-site quote

Walkways & entries

Front walks, side paths, and the run from the driveway to your door. It is the first thing anyone sees of the house, and the thing most often done in a hurry.

3–5 ftTypical width
4–7 daysOn site
Stone fire pit with a fire lit
Free on-site quote

Fire pit areas

A seating area built around a wall-block or steel-insert pit, sized so the chairs actually fit behind the ring instead of half-hanging off the edge.

7 ftSeating clearance
4–7 daysOn site
Paver courtyard with a low stone wall
Free on-site quote

Steps & low walls

Steps down a grade change, steel and paver edging, seat walls and low retaining walls. Anything past about four feet needs a permit and engineering — we tell you that up front, not halfway through.

Under 4 ftNo permit typically
4–8 daysOn site
Our work

The look we build

Styles and laying patterns to pick from before we quote. Bring one to the on-site visit and we will price exactly that.

Paver courtyard with a border course
Paver courtyard with a border course
Covered patio and seating
Covered patio and seating
Natural flagstone, tight joints
Natural flagstone, tight joints
Evening lighting over a patio table
Evening lighting over a patio table
Fire feature set into a gravel court
Fire feature set into a gravel court
Stone steps and a low wall down a grade change
Stone steps and a low wall down a grade change
HerringboneStrongest interlock. The usual pick for driveways.
Running bondSimple and quiet. Reads longer than it is.
BasketweaveTraditional. Suits older houses well.
Stack bondClean grid. Modern, least forgiving of bad cuts.
Why Bluestem

Written down, not promised

Every one of these goes in the proposal you sign, not just on a website.

6″

Six inches of base

Compacted aggregate under every patio, in thin layers, each compacted before the next — with the lift schedule and separation fabric listed in your scope.

Fabric over the clay

Woven separation fabric between Kansas clay and the base stone, so the clay cannot work its way up through it over wet seasons.

👁

You inspect the base

Before any sand or paver goes down we walk the finished base with you and show you the depth and the slope. It is the last day any of it is visible.

$

Fixed written price

An itemized scope with a plain list of what is not included, before you owe anything. Changes go through a written change order or they do not happen.

Workmanship warranty

Written into your contract, covering installation labour. If the work fails because of how we built it, we come back and fix it.

811

Utilities located first

Kansas 811 is called before we break ground on every job, no exceptions. It takes a couple of days, which is why a start date is never tomorrow.

The part you never see

Why ours stay flat

Johnson County sits on heavy clay. It swells when it takes on water and shrinks when it dries, so the ground under your patio moves all year whether or not anything is built on it.

Then winter crosses freezing and thaws again, dozens of times. Water in a badly drained base expands every time it freezes — so a patio that looked perfect in October is heaved by March. None of it is fixable from the top.

6 inchesCompacted base under a patio — more under anything carrying a vehicle.
Thin layersA few inches at a time, each one compacted before the next.
FabricKeeps clay from working up into the stone over wet seasons.
Real fallWater runs away from the foundation instead of sitting against it.
What goes under a patio Pavers over an inch of bedding sand, over six inches of base stone compacted in three layers, over separation fabric, over compacted clay. Compacted clay 6 in. of base stone in three compacted layers 1 in. bedding sand Paver 9 in. deep Slopes away from the house
The shortcut in this trade is a thinner base, dumped in one go and rolled once. It looks identical on day one.
Our process

Four stages, start to finish

Exactly what happens and how long each part takes. Most patios are five to eight days on site.

01

We come look

We walk it, measure, see where your water goes, and mark the shape on the ground. Then you get a fixed written price.

~45 min · quote in 1–2 days
02

Locate & dig

Kansas 811 marks the yard, then out comes the dirt and in goes the fabric and base, compacted in layers.

4–6 days
03

You inspect the base

Before a single paver goes down we walk the finished base with you — depth, slope, all of it.

~20 min
04

Pavers & cleanup

Sand screeded, field laid, edges cut on a wet saw, joints locked, site cleaned, then we walk it together.

1–3 days
Straight answers

What everybody asks

What is this going to cost?

We cannot tell you over the phone without guessing, and a guess usually turns into a change order later. What moves the price: the size, how far material has to be wheeled from the driveway, how much dirt leaves the property, whether there is a grade change needing steps, the paver you pick, and whether something has to come out first.

You get a fixed written price after we have stood in your yard. If it is over budget we will tell you what to trim — usually size or paver choice. Not base depth.

Do I need a permit?

A patio at ground level usually does not. Retaining walls past about four feet, anything structural, and work near an easement usually do — and the rules vary city to city around here. We check it for your address before the proposal. Finding out mid-job is the version that actually costs you.

Why is your bid higher?

Sometimes it is not. When it is, it is almost always what is underneath. Compare bids on four things: how deep they are digging, how thick the base is, whether fabric is listed at all, and whether they describe compacting in layers. If a proposal does not mention any of it, that is not a cheaper patio — it is a different patio.

Can you fix one somebody else built?

Sometimes. A settled section can occasionally be pulled up, re-based and reset with your existing pavers. If the base was never right to begin with, resetting the top just buys a couple of years — and we will tell you which one you have got.

How late in the year can you build?

Usually into November. Pavers are not concrete — there is no cure time — so cold is a comfort problem more than a quality one. Frozen ground is the real stop, and that tends to show up in December.

Service areas

Where we work

Johnson County and the surrounding KC metro. If you are just outside this list, call anyway — we will tell you straight whether it is worth the drive.

Pages for the towns we work in most: Overland Park Leawood Olathe Lenexa Prairie Village Shawnee

Overland ParkLeawoodOlatheLenexa Prairie VillageStilwellShawnee Mission HillsFairwayRoeland Park Spring HillGardner
Get in touch

Request a quote

Tell us about the yard and we will get back to you to set up a time to come look. A text is still the fastest way to reach us.

400 sq ft

About 20 ft × 20 ft — a common back patio.

Call or text

(913) 725-8811

Based in

Overland Park, Kansas

Monday – Friday7am – 6pm
Saturday8am – 2pm
SundayClosed
Step 1 of 3
Pick from the list so we can look at the property before we come out.
Text us instead

Takes about 45 seconds. Opens an email with everything filled in.

Got it — that's on its way.

We'll be in touch within one business day to set a time to come look at the yard. If you'd rather not wait, text (913) 725-8811 and you'll get us directly.

Ready to get on the fall schedule?

Free on-site design and a fixed written price. We are installing through November.

Get free quote (913) 725-8811
Call now Text us